Revision set for
blast pots and systems
Revision set for blast pots and systems with 1 1/4" piping
The revision set serves the complete maintenance and servicing of a 1 1/4" piped blast pot and the safety equipment in the system. Blast pots and its abrasive equipment are subject to natural and continuous wear. Despite the highest quality requirements of Clemco products, it is therefore necessary to carry out regular maintenance work in order to maintain performance and extend the service life of the entire system. Regular maintenance is also an essential contribution to the safety of all operators.
Area of application |
Maintenance and repair |
Features |
1x 90550D P-8-R Y-piece 1 ¼” rubber lined 2x 90551D P-31 Nipple 1 ¼” rubber lined 1x 90552D P-32 HEX nipple 1 ¼” rubber lined 1x 02329D Gasket for inspection door 1x 02321D Pop up valve with shaft 1x 99157D O-Ring with quaterlip 1x 90060D Gasket set RMS-2000 1x 91011D CFT iron cast coupling 1 ¼” 1x 00851D Gasket for CFT 1x 11202D Safety pin for CFT 1x 100715 RLX-III rubber button 1x 100085 Spring for RLX-III 1x 01295D O-Ring for HMS body (System 7) 1x 01335D Gasket for HMS (System 7) 1x 03561I Cover O-Ring for CPF (System 7) 1x 03547I CPF cartridge (System 7) 1x 08416D Gasket for CQP-2/-3/-4 (System 7) 1x 91025D NW-32 nozzle washer (System 7) |